Contractor resource / issued material schedules

Using an issued material schedule

ByPublisheddate not supplied

For UK commercial tiling and flooring contractors, the FathomTrowel material schedule records material entries in a specific approved estimate issue. This guide walks through finding the right files, reading their quantities and checking the entries against the tender you are preparing.

01 / Find the files

Open the issued estimate history for your request

Open your own Request status page and go to Issued estimate history. Each history entry represents an approved and issued estimate revision. When that issue contains material schedule rows, its entry offers both a PDF schedule and a CSV schedule download. Choose the files from the history entry for the issue you are reviewing.

The guide is public and does not require an account sign-in. Your request-status page is specific to your request, so use the status link supplied for that request.

02 / Confirm the issue

Match the schedule to the revision you intend to tender

Check the history entry’s revision number and issue date. The PDF also records the project, issued estimate revision, publication ID, revision number, issue date under Issued on, and schedule entry count under Schedule entries. Match these details before you use quantities from a downloaded file.

If the history shows a change note or source drawing revision, read it and compare the drawing reference with the tender information you are using. Later estimate edits appear in the status page only after they have been approved and issued; draft edits do not change the issued schedule.

03 / Read the entries

Start with the kind, description and unit

The PDF labels the row kind Kind; the CSV header is row_type. The values are calculated, scope and planned. A calculated row comes from a calculated material line, a scope row records a material scope line, and a planned row records a listed planned material quantity. Use the description and unit with that row to identify what the estimate records.

The PDF labels the text Description and Unit; the CSV headers are description and unit. Read the description and unit together rather than comparing quantities alone.

PDF issue details

  • Project
  • Issued estimate revision
  • Publication ID
  • Revision number
  • Issued on
  • Schedule entries

The CSV is a row table with the headers below; use the matching history entry to confirm which issue it belongs to.

04 / Understand the values

Keep measured, gross and planned quantities distinct

Measured quantity is the measured amount recorded for a row. Gross material quantity is the material amount recorded for the estimate and is what the CSV calls order_quantity. Planned quantity is a separately listed amount for a planned row. They describe different values; do not treat one as a replacement for another.

In the CSV, quantity_basis identifies a measured or planned row. The quantity field carries the corresponding measured or planned value: measured for calculated and scope rows, planned for planned rows. The PDF gives separate labels for measured quantity, gross material quantity and planned quantity. For a planned row, measured and gross material quantities, pack coverage and whole-pack count are not populated.

Kind

PDF label
Kind
CSV header
row_type

`calculated` is a material entry from a calculated estimate line; `scope` is a material scope line; `planned` is a listed planned material quantity.

Description

PDF label
Description
CSV header
description

Use the written description to identify the material or scope being recorded.

Unit

PDF label
Unit
CSV header
unit

Read each quantity with its stated unit and check that unit against the tender documents.

Measured quantity

PDF label
Measured quantity
CSV header
measured_quantity

The measured amount recorded for a measured row. The CSV also carries it in `quantity` when `quantity_basis` is `measured`.

Gross material quantity

PDF label
Gross material quantity
CSV header
gross_material_quantityorder_quantity

The gross material amount recorded by the estimate. The CSV `order_quantity` carries this same value; it is not a complete purchase order.

Planned quantity

PDF label
Planned quantity
CSV header
quantity_basisquantity

For a planned row, `quantity_basis` is `planned` and `quantity` carries the planned amount. The CSV has no separate `planned_quantity` column.

Pack coverage per pack

PDF label
Pack coverage per pack
CSV header
pack_coverage_per_pack

The coverage amount per pack, when provided. Read it alongside the row unit.

Whole-pack count

PDF label
Whole-pack count
CSV header
whole_pack_count

The whole-pack count calculated from gross quantity and coverage when both are provided.

Waste allowance percent; Waste allowance label; Waste allowance fixed amount

PDF label
Waste allowance percent; Waste allowance label; Waste allowance fixed amount
CSV header
waste_allowance_percentwaste_allowance_labelwaste_allowance_fixed_amount

These fields report allowance details recorded for the row. They do not establish a default waste rate or a new allowance formula.

Note; Provisional

PDF label
Note; Provisional
CSV header
noteprovisional

Review any note and provisional status. The PDF shows provisional as Yes or No; the CSV field is blank for planned rows.

05 / Check allowances and gaps

Treat missing values as unavailable information

In the PDF, a missing value is shown as Not provided. In the CSV, the corresponding cell is blank. Neither means zero and neither supplies a default. If a value matters to your tender review, check the drawings, specification and project information or raise the question through your normal project process.

Review any waste allowance percent, label or fixed amount that is present, as well as the note and provisional status. Do not infer a waste rate or fill a blank with a presumed allowance. If an approved issue has no schedule rows, its history entry has no PDF or CSV schedule download, and the status page says: “No material schedule rows are included in this approved issue.”

06 / Use it in tender review

Cross-check every entry against the project documents

  1. 01

    Compare each description and unit with the matching tender scope, drawings and specification. Check the source drawing revision when the issue history shows it.

  2. 02

    Review the measured, gross material or planned basis that applies to each row. Then check any notes, provisional flags, waste allowance fields, pack coverage and whole-pack count.

  3. 03

    Read the issued estimate assumptions and exclusions alongside the schedule. Use them to identify questions or differences for your tender review; they do not replace your own checks against the project documents.

FathomTrowel outputs reflect the project information supplied, and detail is grouped only where that information supports it. Site verification, design responsibility, specification review and procurement advice are excluded unless separately agreed. Contractors retain their rates, commercial decisions and final bid. A schedule is not a site-verified quantity, complete purchase order, procurement recommendation or guarantee of order adequacy, final cost or tender outcome.