FathomTrowel / UK commercial flooring

Commercial flooring takeoffs for UK tenders

Drawing takeoffs for UK commercial tiling and flooring contractors. Send the project brief and drawing set to receive measured quantities and a clear record of the scope, allowances and pricing basis.

Request a takeoff

The takeoff pack

Practical outputs for your tender

See what has been measured, how the scope has been grouped, and which assumptions or exclusions shape the summary.

Measured quantities

Quantities measured from the supplied drawing set, with the relevant trade scope kept in view.

Schedules

Measured items set out with the finish or description shown in the project information.

Allowances

Relevant material or preparation allowances identified in line with the scope supplied for the work.

Priced summary

A priced summary using the project scope and rates supplied for that work.

Assumptions

The interpretation used where project information needs to be read in context is made clear for review.

Exclusions

Work outside the stated scope, or not supported by the information supplied, is recorded as excluded.

Drawing basis and scope

Start with the information behind the work.

Drawings, finish information, revisions and relevant site or preparation notes help define the takeoff. The request form lets you share the set and explain the trade scope for the tender.

Useful project information

  • Architectural and floor plans
  • Finish schedules and specifications
  • Current drawing revisions
  • Site, substrate or preparation notes where available

The takeoff is based on the information supplied. Assumptions make interpretation visible; exclusions mark work outside the stated scope or information available for measurement.

Have a tender to measure?

Send the drawing set and project brief.

Share the project, trade scope and available drawings through the takeoff request form.

Request a takeoff