Measured quantities
Quantities measured from the supplied drawing set, with the relevant trade scope kept in view.
FathomTrowel / UK commercial flooring
Drawing takeoffs for UK commercial tiling and flooring contractors. Send the project brief and drawing set to receive measured quantities and a clear record of the scope, allowances and pricing basis.
Request a takeoffThe takeoff pack
See what has been measured, how the scope has been grouped, and which assumptions or exclusions shape the summary.
Quantities measured from the supplied drawing set, with the relevant trade scope kept in view.
Measured items set out with the finish or description shown in the project information.
Relevant material or preparation allowances identified in line with the scope supplied for the work.
A priced summary using the project scope and rates supplied for that work.
The interpretation used where project information needs to be read in context is made clear for review.
Work outside the stated scope, or not supported by the information supplied, is recorded as excluded.
Drawing basis and scope
Drawings, finish information, revisions and relevant site or preparation notes help define the takeoff. The request form lets you share the set and explain the trade scope for the tender.
The takeoff is based on the information supplied. Assumptions make interpretation visible; exclusions mark work outside the stated scope or information available for measurement.
Have a tender to measure?
Share the project, trade scope and available drawings through the takeoff request form.