FathomTrowel / Quantities and estimating inputs
Flooring estimate inputs and allowances
Explore guides to issued estimate revisions, flooring quantities, waste allowances, labour, transitions and preparation, with project-specific checks for each input.
Quantities and estimating inputs
Browse all related resources
Each resource below covers a connected service, scope or estimating question. Open the page that matches your need, or use the request form when you are ready to share a project.
- Flooring estimate reading guideReview quantities, allowances, assumptions and exclusions in a saved estimate.
- Issued estimate revisions guideUse issued estimate history, recorded change notes and drawing revisions when reviewing a bid.
- Material schedule guideRead issued material schedule rows, quantities, allowances and pack details against a tender.
- Flooring waste allowances guideReview waste allowances by material, layout and project conditions.
- Flooring labour inputs guideReview the activity, crew, output basis and conditions behind labour inputs.
- Flooring transitions and thresholds guideCheck finish junctions, door thresholds and trim scope.
- Preparation allowances guideRead drawing and specification signals, measure stated preparation scope, and flag conditions that need site confirmation.
Ready to discuss a project?
Share the project brief and any drawings you have available for a scope review.